Download New York Acp9 Template in PDF Open New York Acp9 Editor Now

Download New York Acp9 Template in PDF

The New York ACP9 form is an essential document used to apply for an asbestos variance through the New York City Department of Environmental Protection. This form allows individuals and organizations to request exemptions from specific asbestos regulations when they cannot comply with standard procedures. Proper completion and timely submission of the ACP9 form are crucial for ensuring compliance and avoiding potential violations during asbestos-related work.

Open New York Acp9 Editor Now

More PDF Documents

Similar forms

  • New York ACP7 Form: This form is used for asbestos project notifications. Like the ACP9, it requires detailed information about the project, including the location and type of work being performed, and must be submitted prior to starting any asbestos-related activities.
  • New York ACP5 Form: This is an asbestos project completion form. Similar to the ACP9, it documents the completion of asbestos removal or abatement projects and ensures compliance with city regulations.
  • NYS Department of Labor Asbestos Notification Form: This form serves to notify the state labor department of asbestos projects. It parallels the ACP9 by requiring details about the work and the parties involved, ensuring regulatory oversight.
  • EPA Notification of Asbestos Demolition or Renovation Form: This form is required for projects that involve asbestos removal at the federal level. Like the ACP9, it seeks to inform regulatory bodies of impending work and requires similar project details.
  • New York City Asbestos Handling License Application: This application is for contractors seeking to obtain a license to handle asbestos. It is similar to the ACP9 in that it requires information about the applicant and the nature of the work to be performed.
  • New York City Asbestos Abatement Plan: This document outlines the procedures for safely removing asbestos. It shares similarities with the ACP9 in its need for detailed procedural descriptions and risk management strategies.
  • New York City Environmental Control Board Asbestos Violation Report: This report is filed when there is a violation of asbestos regulations. It is akin to the ACP9 in that it must detail the circumstances of the violation and the specific regulations that were not followed.

Guide to Filling Out New York Acp9

Completing the New York ACP9 form requires careful attention to detail. This form is used to apply for a variance related to asbestos control. Ensure that all sections are filled out accurately and completely before submission.

  1. Obtain a typewritten copy of the New York ACP9 form.
  2. Fill in the Facility section with the address, borough, and zip code of the location where the work will take place.
  3. Complete the Applicant section. Provide your name, telephone number, address, city, state, and zip code. Indicate your capacity (Contractor, Consultant, Owner, or Other) and include the contact person's name.
  4. In the section for Asbestos Rule Provisions, specify all NYC DEP or NYS DOL asbestos rule provisions from which you are requesting a variance.
  5. Identify the floors and/or areas where the work involving the variance will occur.
  6. Provide a detailed explanation of the reasons for the request and a description of the proposed action. Attach any additional sheets if necessary.
  7. State the alternative procedures that will be employed to satisfy each requirement as modified. Include any necessary attachments.
  8. Include color-coded drawings that identify the work areas and the location of decontamination enclosure systems.
  9. Calculate the total amount of asbestos-containing material (ACM) affected by the variance in square feet and linear feet. Determine the applicable fee based on the total amount of ACM.
  10. Complete the Fee Schedule section by entering the total fees based on the calculations made.
  11. In the declaration section, print the names of the owner and the applicant (if not the owner). Both parties must sign and date the form.
  12. Review the completed form for accuracy and completeness before submission.